cost breakdown in table

This commit is contained in:
Shihaam Abdul Rahman 2023-06-24 01:03:08 +05:00
parent 7d856e596e
commit 43e59dd1ba
Signed by: shihaam
GPG Key ID: 6DA2E87EBC227636
4 changed files with 8 additions and 3 deletions

Binary file not shown.

After

Width:  |  Height:  |  Size: 1.9 KiB

BIN
main_distribution_box.png Normal file

Binary file not shown.

After

Width:  |  Height:  |  Size: 1.7 KiB

Binary file not shown.

After

Width:  |  Height:  |  Size: 2.1 KiB

View File

@ -36,9 +36,14 @@ The project cost breakdown includes the necessary equipment and components for t
The cost breakdown for the cable installation project is as follows:
- MVR 265,000 for cables, distribution box, splitters, patch cords, and ODF.
- MVR 60,000 for splicing works (with potential for cost reduction through optimization).
- MVR 20,000 for the OLT (control device).
| Cost Component | Amount (MVR) |
|------------------------|--------------|
| Cables and Equipment | 265,000 |
| Splicing Works | 60,000 |
| OLT (Control Device) | 20,000 |
| Digging Labor (Estimate)| To be arranged by council |
| Total Project Cost | 345,000 |
The total project cost amounts to MVR 345,000, which can be paid within a span of 1 year through monthly installments of MVR 28,750. Additionally, there is a one-time payment of MVR 1000 for the OLT (client router).