diff --git a/last_mile_distribution_box.png b/last_mile_distribution_box.png new file mode 100644 index 0000000..251e54e Binary files /dev/null and b/last_mile_distribution_box.png differ diff --git a/main_distribution_box.png b/main_distribution_box.png new file mode 100644 index 0000000..f8b04ae Binary files /dev/null and b/main_distribution_box.png differ diff --git a/network_operations_center.png b/network_operations_center.png new file mode 100644 index 0000000..93ac472 Binary files /dev/null and b/network_operations_center.png differ diff --git a/proposal.md b/proposal.md index 0250a1a..3336b6c 100644 --- a/proposal.md +++ b/proposal.md @@ -36,9 +36,14 @@ The project cost breakdown includes the necessary equipment and components for t The cost breakdown for the cable installation project is as follows: -- MVR 265,000 for cables, distribution box, splitters, patch cords, and ODF. -- MVR 60,000 for splicing works (with potential for cost reduction through optimization). -- MVR 20,000 for the OLT (control device). + +| Cost Component | Amount (MVR) | +|------------------------|--------------| +| Cables and Equipment | 265,000 | +| Splicing Works | 60,000 | +| OLT (Control Device) | 20,000 | +| Digging Labor (Estimate)| To be arranged by council | +| Total Project Cost | 345,000 | The total project cost amounts to MVR 345,000, which can be paid within a span of 1 year through monthly installments of MVR 28,750. Additionally, there is a one-time payment of MVR 1000 for the OLT (client router).