added diagram and info about digging that council need to arrange
This commit is contained in:
parent
0bfd594a12
commit
7d856e596e
BIN
box_location_map.png
Normal file
BIN
box_location_map.png
Normal file
Binary file not shown.
After Width: | Height: | Size: 895 KiB |
@ -27,8 +27,13 @@ With cable redundancy, the network is designed with multiple cables running para
|
||||
|
||||
By implementing cable redundancy, the cable installation project not only safeguards against potential disruptions but also provides a robust and reliable infrastructure that can withstand unforeseen events. This ensures that residents can rely on the network for essential services, such as internet, TV, and other communication needs, even in challenging circumstances.
|
||||
|
||||
### Street box diagram:
|
||||

|
||||
|
||||
### Project Cost Breakdown
|
||||
|
||||
The project cost breakdown includes the necessary equipment and components for the cable installation. However, it's important to note that the pricing for digging labor is not included in the provided cost estimate. The council will be responsible for arranging the necessary digging labor and associated costs for the project. This collaboration will ensure that the cable installation proceeds smoothly and in compliance with local regulations and requirements.
|
||||
|
||||
The cost breakdown for the cable installation project is as follows:
|
||||
|
||||
- MVR 265,000 for cables, distribution box, splitters, patch cords, and ODF.
|
||||
|
Loading…
x
Reference in New Issue
Block a user