@ -27,11 +27,11 @@ The cable installation project incorporates cutting-edge technology, ensuring it
|
|||||||
|
|
||||||
The cost breakdown for the cable installation project is as follows:
|
The cost breakdown for the cable installation project is as follows:
|
||||||
|
|
||||||
- MVR 265k for cables, distribution box, splitters, patch cords, and ODF.
|
- MVR 265,000 for cables, distribution box, splitters, patch cords, and ODF.
|
||||||
- MVR 60k for splicing works (with potential for cost reduction through optimization).
|
- MVR 60,000 for splicing works (with potential for cost reduction through optimization).
|
||||||
- MVR 20k for the OLT (control device).
|
- MVR 20,000 for the OLT (control device).
|
||||||
|
|
||||||
The total project cost amounts to MVR 345k, which can be paid within a span of 1 year through monthly installments of MVR 28,750. Additionally, there is a one-time payment of MVR 1000 for the OLT (client router).
|
The total project cost amounts to MVR 345,000, which can be paid within a span of 1 year through monthly installments of MVR 28,750. Additionally, there is a one-time payment of MVR 1000 for the OLT (client router).
|
||||||
|
|
||||||