diff --git a/proposal.md b/proposal.md index c1d67cb..73e5d3e 100644 --- a/proposal.md +++ b/proposal.md @@ -27,11 +27,11 @@ The cable installation project incorporates cutting-edge technology, ensuring it The cost breakdown for the cable installation project is as follows: -- MVR 265k for cables, distribution box, splitters, patch cords, and ODF. -- MVR 60k for splicing works (with potential for cost reduction through optimization). -- MVR 20k for the OLT (control device). +- MVR 265,000 for cables, distribution box, splitters, patch cords, and ODF. +- MVR 60,000 for splicing works (with potential for cost reduction through optimization). +- MVR 20,000 for the OLT (control device). -The total project cost amounts to MVR 345k, which can be paid within a span of 1 year through monthly installments of MVR 28,750. Additionally, there is a one-time payment of MVR 1000 for the OLT (client router). +The total project cost amounts to MVR 345,000, which can be paid within a span of 1 year through monthly installments of MVR 28,750. Additionally, there is a one-time payment of MVR 1000 for the OLT (client router). ### Implementation and Service Provider